Goodman Interlink

Overview

Goodman Interlink is a landmark warehouse and distribution development in Hong Kong. Located at Tsing Yi in the heart of the ports district and adjacent to the Stonecutters Bridge, the 224,000 sqm (2.4 million sq ft) development over 24 levels completed in January 2012, and is the fourth largest warehouse in Hong Kong.

Since its launch in December 2009, the prime warehousing space at Goodman Interlink has been highly sought-after, with 86.5% of the total gross floor area pre-leased to major international and local customers including DHL Supply Chain, Yusen Air & Sea Services, BEL International Logistics, Hankyu Hanshin Express and Zuellig Pharma.

Goodman Interlink is built in compliance with both the HK BEAM (Hong Kong Building Environments Assessment Method) and LEED (Leadership in Energy and Environmental Design) environmental assessment methods.  It has received a Gold Standard certification from HK BEAM and a certification from LEED.  It is the first of its type to obtain such accreditations and awards in Hong Kong.

Accessibility

  • 2 km from Container Terminal
  • 20 km from Hong Kong International Airport
  • 25 km from mainland China border

Delivery time

  • Project time: 25 months
  • Start December 2009
  • Final delivery: January 2012

Technical details

  • Ramp floors: 137,297 sq ft
  • Cargo lift floors: 81,951 sq ft
  • Floor-to-floor height: 6.5m (ramp floors)
  • Floor-to-floor height: 5.5m (cargo lift floors)
  • Under beam height: 5.5m (ramp floors)
  • Under beam height: 4.5m (cargo lift floors)
  • Loading capacity: 15kPa – 17.5kPa
  • 10 x 5 tonnes cargo lifts
  • 6 passenger lifts